Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

James Cook

  • Customer: Jan De Nul
  • Period: September 2014
James Cook

Vessel Type: Trailing Suction Hopper Dredger

Description: Extensive Dry Docking and Repair Works

 

  • Steel works (180 t.) on keelson, hopper area, tanks and bottom doors
  • Surface treatment of keelson, fuel and ballast tanks, void spaces and dredge compartments
  • Removal of upper and bottom doors (46 pcs), replacement of bushes and rubber sealing, washing, cleaning, UTM checking and pressure testing.
  • Dismantling and overhauling of shallow water door mechanism.
  • Overhauling of draghead gantry and swell compensator cylinders
  • Dismanling of dredge pump suction cover (Diam:2657 mm.), washing, blasting, welding repair, machining of flange surface, re-boring of bolt holes.
  • Overhauling of trunnion gantries including cylinders and winches
  • Renewal of horizontal jet water pipes (Diam: 900mm.) on bottom doors
  • Renewal of AMOB Line pipes
  • Removal and overhauling of sliding pieces